Removal of AFT and FW Galley Coffee Makers and replace with Water Boilers on 6 B757 and 6 B767. The installation of 18 Stowage Box (kit) on board 3 B767 aircrafts
The work consist in:
• Design activities and support aimed to obtain the EASA Change Approval for the Coffee Maker replacement with Water Boiler and for the design, manufacturing and certification of new Stowage Box onto relevant aircraft to finally achieve the desired configuration.
• Supply of a new Stowage Box.